Done

Done

Coming Together

Coming Together

In Primer

In Primer

Tuesday, January 3, 2012

On More Shot

Well, just before New Years the temp warmed up and I got a chance to hit the garage one more time.
I installed the fill neck on the fuel tank plus the fitting running from the tank to the pump. Then I put in the vent fitting. I still have to mount the rollover valve somewhere on the frame higher than the fill neck and run the line.
It was still warm out so I installed the stainless steeel Ram Horn manifolds. I put the sparkplugs in temporaily to decide what boots I will need on the plug wires. Next I put the fuel pump on. Lookin good.
Looks like I will have a little trouble running the exhaust pipe on the drivers side or I will have to do some figuring on the double D shaft going from the steering column to the steering rack.
Sooo, next will be the fuel lines and the exhaust come Spring.