Done

Done

Coming Together

Coming Together

In Primer

In Primer

Tuesday, March 20, 2012

Been busy

Got a lot of parts ordered and all arrived this week. Installed the Radiator hoses but think I will change the top to a different type. got the new long water pump but now have to get some bolts to hang it.
Got the speedometer drive and driven gears and put that all together today. This allowed me to put the driveline in that's been patienly waiting. All fits good so far.
The Flowmaster stainless steel 2.5 inch exhaust kit arrived, so started mocking that up today. This will take a while. Got to practice welding stainless pipe before I ruin the good stuff.
Still have to weld up the transmission cover thats waiting.
Fuel line is here. That will install shortly.
Weather is great now.
Time to get something done.

1 comment:

  1. You have about 3 weeks and it will be 100* in your garage ?

    ReplyDelete