Done

Done

Coming Together

Coming Together

In Primer

In Primer

Thursday, September 13, 2012

More procrastination and a little work

The heat has finally subsided, but more interuptions came along. Nancy headed to London with my daughter Shannon and grandson Parker for two weeks, soooo, good time for a road trip on the Harley. Headed to Topeka to see Rubber Toes and do a little cruisin. Headed south out of Topeka for some pie and broke my clutch cable 120 miles from Toes house. Nursed it back to Topeka doing some fancy synchronized shifting without the clutch, and started calling around for a new cable. Had to go to Olatha, (60 miles away) for a new one. Toes and all his tools and knowledge helped me get the new one installed. Headed back home the next day with rain looking me in the face. Toes rode with me to Atchison and a half mile later it started raining. 300 miles of rain. At least it wasn't cold, and I made it home okay.
The girls and Parker got back home and the grandson helped me do some more work on the airconditioning. Got all the holes drilled and hoses run, including the dryer. Yop can see the dryer in the picture mounted on the right inner fender panel below the AC pump.
Still have to make a bracket for the heater valve that will fit behind the right kick panel in the cab.
Maybe next week i'll get more done.

No comments:

Post a Comment